A 10,000 sq. ft. pre-engineered metal building addition for testing and engineering of Ruskin’s products. Existing lab space remained occupied during construction. The project included a new loading dock and 400 ln. ft. of cast-in-place retaining walls.

Date

May 10, 2018

Client

Ruskin Manufacturing

Category

INDUSTRIAL